
Add to Cart
Continuous Automatic Snacks Frying Machine , Banana Chips Maker Machine CE / ISO
Working principle: It is based on the vacuum system ordered in a vacuum of 0.093Mpa, that is, the pressure is 0.09Mpa and the boiling point is about 40 degrees. Under negative pressure vacuum, oil is used as the heat transfer medium, and the moisture in the food It will rapidly evaporate and be ejected from the object, and the heat enters the inside of the food tissue, so that the food cells swell to achieve a soft and porous tissue structure. In water-containing food, vacuum is closely related to low temperature. Under high vacuum, you can Avoid the disadvantages of various cities and the loss of food nutrition caused by high-temperature frying.
1) Fruits: Apple, Banana, Pineapple, Peach, Jackfruit etc.
2) Vegetables: Okra, Carrot, Pumpkin, Snap bean, Sweet potato, Taro, Potato, Garlic, Green Pepper, Onion, etc.
3) Nuts: cashew nut, Peanut, etc.
4) Seafood: shrimp, crab, fish, etc.
5) Poultry.
Model | VF-LY50 | VF-LY100 | VF-LY200 |
Basket Size | dia600*500 | dia750*530 | dia1200*600 |
L*W*H | 1400*3500*2500 | 1800*4000*2900 | 2500*4500*3100 |
Vacuum Degree | -0.095mpa~-0.098mpa | ||
Steam Pressure | 0.4~0.8mpa (adjustable) | ||
Working temperature | 75-110℃ | 75-110℃ | 75-110℃ |
Pump Power | 3kw | 5.5kw | 7.5kw |
Vacuum Pump Power | 7.5kw | 11kw | 15kw |
Motor Power | 3kw | ||
Capacity | 50kg/batch | 100kg/batch | 200kg/batch |
Total Power | 15kw | 22kw | 30kw |
Feeding | 30~50kg/time | 80~100kg/time | 170~200kg/time |
Raw Material Input | 30kg-50kg | 80kg-100kg | 170kg-200kg |
When loading the frame, check whether the latch of the frame is properly inserted; and check whether the three-branch support of the vacuum fryer is firmly installed;
Whether the materials in the material box are loaded in a hurry to adjust the feeding speed in a timely manner; check whether the electrical appliances of the vacuum fryer are safely grounded;
Check if there is any debris in the frying chamber of the vacuum fryer; check if the filter of the vacuum fryer is clean;
Check whether the water supply of the vacuum pump is normal and the water temperature should be below 25 ℃; check whether the pipes of the vacuum fryer are properly sealed;
Always pay attention to whether the steam source is normal and check whether the compressed air of the vacuum fryer is normal;
Heater Exchange
It is fast and made by ss 304 food grade.
Condenser
It can be customized according to different temperature of underground water.
Oil storage tank
It is for oil storage before frying. The oil will be heated in it firstly. During frying, the oil will be cycled between oil storage tank and frying pot.
PLC control system
Brand: Mitsubishi
It is control the whole machine.
This make the machine operate fully automatically. No need to manual during processing.
Touch screen
Brand: Mitsubishi
The new type is connect directly with the machine body, not separate part.
It is easy to understand and operate.
Electrical Components
Brand: Schneider
It mainly includes dis-connector, frequency converter and thermal overload relay.
Catalog for Automatic Vacuum Frying Machine.pdf
FAQ
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacturer. You will get competitive price and high quality.
3) Can you guarantee your quality?
Of course. We are the factory. More important, we put a high value on our reputation. High quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place an order, for small quantity 15-20 days is enough. For big quantity, we can talk further.
5) What about the transportation and delivery date?
Normally we use sea for shipment to save customer's money. It is about 25-40 days. It also depends on which country and port you are.