
Add to Cart
Unique Deoiling Effect Vacuum Frying Machine , Banana Chips Maker Machine
Vacuum frying is frying and dehydrating food at low temperature (80 ~ 120 ℃), which can effectively reduce the damage of high temperature to food nutritional components. The vacuum low temperature fryer equipment can effectively control the acidification of fried oil and the oil content of food, so that the fried food not only has good color, aroma and taste, but also has a clean and beautiful appearance, which improves the product quality and extends the storage period.
1) High utilization rate of oil frying
During the vacuum frying process, the fat is in a negative pressure state, and the gas dissolved in the fat quickly escapes in a large amount, reducing the probability of the fat being oxidized when it contacts the air; the boiling point of water in the food is reduced, the steam pressure generated is small, and the temperature Low, the degree of deterioration of grease is greatly reduced.
2) Less fuel consumption
In the vacuum frying process, the moisture vaporization speed is fast, so the structure of the fried product is porous and loose, and the oil is degreased in a vacuum state, which reduces the retention of oil in the loose structure of the fried product.
3) Using advanced vacuum low temperature frying technology, it can quickly dehydrate and dry in a very short period of time to obtain foods with very low water content. The characteristics of the vacuum fryer for fries are low oil content, crisp and not greasy, and preserve the original food Shape, color, fragrance, taste, and vitamins, minerals, fiber and other nutrients
Model | VF-LY50 | VF-LY100 | VF-LY200 |
Basket Size | dia600*500 | dia750*530 | dia1200*600 |
L*W*H | 1400*3500*2500 | 1800*4000*2900 | 2500*4500*3100 |
Vacuum Degree | -0.095mpa~-0.098mpa | ||
Steam Pressure | 0.4~0.8mpa (adjustable) | ||
Working temperature | 75-110℃ | 75-110℃ | 75-110℃ |
Pump Power | 3kw | 5.5kw | 7.5kw |
Vacuum Pump Power | 7.5kw | 11kw | 15kw |
Motor Power | 3kw | ||
Capacity | 50kg/batch | 100kg/batch | 200kg/batch |
Total Power | 15kw | 22kw | 30kw |
Feeding | 30~50kg/time | 80~100kg/time | 170~200kg/time |
Raw Material Input | 30kg-50kg | 80kg-100kg | 170kg-200kg |
1. Fumigation wooden case with water-proof embrace
2. Nude pack after plastic film wrapping
3. Upon your requirements
We provide high quality service:
1) Consultation before, during, and after sales;
2) Project planning and design;
3) Debugging until everything is functional;
4) Shipping management from factory to the destination;
5) Installing, maintenance and operation training;
6) New production techniques and formulas;
7) 1 year complete warranty and life-time maintenance service.
- Oil storage tank
It is for oil storage before frying. The oil will be heated in it firstly. During frying, the oil will be cycled between oil storage tank and frying pot.
- PLC control system
Brand: Mitsubishi
It is control the whole machine.
This make the machine operate fully automatically. No need to manual during processing.
- Touch screen
Brand: Mitsubishi
The new type is connect directly with the machine body, not separate part.
It is easy to understand and operate.
- Electrical Components
Brand: Schneider
It mainly includes dis-connector, frequency converter and thermal overload relay.
Catalog for Automatic Vacuum Frying Machine.pdf
FAQ
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacturer. You will get competitive price and high quality.
3) Can you guarantee your quality?
Of course. We are the factory. More important, we put a high value on our reputation. High quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place an order, for small quantity 15-20 days is enough. For big quantity, we can talk further.
5) What about the transportation and delivery date?
Normally we use sea for shipment to save customer's money. It is about 25-40 days. It also depends on which country and port you are.